Q345 Carbon steel coil
  • Payment Term:TT,L/C,etc
  • Price Term:Ex-Work,FOB,CNF,CFR,CIFetc
  • MOQ:1Ton
  • Delivery Time:Usually 5-7days, or upon negotiation
  • Loading Port:TIANJIN,SHANGHAI,DALIAN ,QINGDAO,etc
  • Package:Wooden pallet+waterproof paper,wooden pallet+cardboard,wooden pallet+wooden cases,accept customization
  • Samples:Free samples are provided but the freight is borne by the buyer
Inquiry

●  Product introduction  ●


product-parameter.png

Product NameCold Rolled/ Hot Rolled Carbon Steel Coils 
StandardAISI,ASTM,DIN,JIS,GB,JIS,SUS,EN,etc.
MaterialQ195, Q215,Q235,Q345,ST37, A36,45# ,16Mn, SPHC,SGCC,CGCC
Thickness(mm)

Hot Rolled Thickness:2.75mm-100m

mCold Rolled Thickness:0.2mm-3mm

As Your Request

Width(mm)45mm-2200mm, As Your Request
TechniqueHot rolled / cold rolled
SurfaceBare,Black,Oiled,Shot Blasted,Spray Paint,Coated,Galvanized,or as Your Request
Coil ID508-610mm or as per your request
Coil Weight3~5 Tons or as per your request
ApplicationConstruction, machinery manufacturing, container manufacturing, shipbuilding, bridges, etc.
PackingStandard Export packing(Plastic film in the first layer,second layer is Kraft paper. Third layer is galvanized sheet)


product-display.png

Carbon steel coil display.jpg


company-introduction.png

Sichuan Baogang Steel Co.,Ltd. is located in the beautiful scenery, transportation developed in sichuan province , convenient transportation, fast product transportation.Manufacturer supply: carbon steel pipe, carbon steel rod, carbon steel plate coil, carbon steel rod, stainless steel profiles, corrosion resistant nickel-molybdenum alloy, inconel series, incoloy series, monel series, nickel series of various materials of stainless steel materials, carbon materials used in machinery manufacturing, transportation equipment, petrochemical and other industries.

carbon steel warehouse.jpg


Quality-control.png

Sichuan Baogang Steel Co.,Ltd. have the strictest product quality control system, which starts from the purchase of raw materials. During the production, packaging and transportation, we have to strictly refer to the specifications.

Quality control.jpg


our-product-package.png

Packaging and loading:

Packaging: According to customers' needs, use wrapping paper. If the transportation period exceeds 10 days or encounters special climate, we will use waterproof packaging and add plastic film to prevent moisture, water and rust.

Loading: We use the wooden pallet,triangular wood to fix the coil,and the steel wire rope to hold on the both side. That can prevent from the crush injury effectively.

Product packaging.jpg


FAQ.png

Q1:Accepted delivery terms

A1:EXW, FOB, CFR, CIF, FCA, FSA, CPT, CIP, DAT, DAP, DDP, DDU

Q2:Accepted Payment Types

A2:T/T, L/C

Q3:What is your delivery time ?

A3:8000 tons of inventory guarantee immediate delivery, Non-stock products, delivery within 5-7 days.

Q4:Accepted payment currencies

A4:CNY, USD, EUR, JPY, CAD, AUD, HKD, GBP, CHF

Q5:What standard steel can you provide?

A5:We can provide various standards, such as: AISI, ASTM, ANSI, ASME, UNS, SAE, DIN, EN, GB, JIS, etc

Q6:How do you guarantee the product quality?

A6:CE, ISO certificate, supporting any third party inspection. A pre-production sample before mass production, final Inspection before shipment.

●  Get A Free Quote  ●

SUBMIT