Galvanized steel wire
  • Payment Term:TT,L/C,etc
  • Price Term:Ex-Work,FOB,CNF,CFR,CIFetc
  • MOQ:1Ton
  • Delivery Time:Usually 5-7days, or upon negotiation
  • Loading Port:TIANJIN,SHANGHAI,DALIAN ,QINGDAO,etc
  • Package:Wooden pallet+waterproof paper,wooden pallet+cardboard,wooden pallet+wooden cases,accept customization
  • Samples:Free samples are provided but the freight is borne by the buyer
Inquiry

●  Product introduction  ●

product-parameter.png

Product  NameGalvanized Steel Wire
GradeQ195 Q235 45# 60# 65# 70# 80# 82B carbon steel
Zinc coating30g-360g
Size0.3-6.0mm
Coil Weight10kg,25kg,50kg  or as customers' requirement
Surface TreatmentEletro Galvanized and hot dipped Galvanized Wire
MaterialEletro Galvanized With Caron Steel hot dipped Galvanized Wire
Applicationstranded  conductors/ACSR/cable/fencing gabion/guy wire/stay wire,etc 


product-display.png

Galvanized wire.jpg

product surface.jpg


company-introduction.png

Sichuan Baogang Steel Co.,Ltd. is located in the beautiful scenery, transportation developed in sichuan province , convenient transportation, fast product transportation.Manufacturer supply: carbon steel pipe, carbon steel rod, carbon steel plate coil, carbon steel rod, stainless steel profiles, corrosion resistant nickel-molybdenum alloy, inconel series, incoloy series, monel series, nickel series of various materials of stainless steel materials, carbon materials used in machinery manufacturing, transportation equipment, petrochemical and other industries.

Galvanized steel warehouse.jpg


Quality-control.png

Sichuan Baogang Steel Co.,Ltd. have the strictest product quality control system, which starts from the purchase of raw materials. During the production, packaging and transportation, we have to strictly refer to the specifications.

Quality control.jpg


our-product-package.png

Packaging and loading:

Packaging: According to customers' needs, use wrapping paper. If the transportation period exceeds 10 days or encounters special climate, we will use waterproof packaging and add plastic film to prevent moisture, water and rust.

Loading: We use the wooden pallet,triangular wood to fix the coil,and the steel wire rope to hold on the both side. That can prevent from the crush injury effectively.

Product packaging.jpg


FAQ.png

Q1:Accepted delivery terms

A1:EXW, FOB, CFR, CIF, FCA, FSA, CPT, CIP, DAT, DAP, DDP, DDU

Q2:Accepted Payment Types

A2:T/T, L/C

Q3:What is your delivery time ?

A3:8000 tons of inventory guarantee immediate delivery, Non-stock products, delivery within 5-7 days.

Q4:Accepted payment currencies

A4:CNY, USD, EUR, JPY, CAD, AUD, HKD, GBP, CHF

Q5:What standard steel can you provide?

A5:We can provide various standards, such as: AISI, ASTM, ANSI, ASME, UNS, SAE, DIN, EN, GB, JIS, etc

Q6:How do you guarantee the product quality?

A6:CE, ISO certificate, supporting any third party inspection. A pre-production sample before mass production, final Inspection before shipment.

●  Get A Free Quote  ●

SUBMIT